Infrastructure

Infrastructure

Total area : 10,000 SQ. METER
Total Reaction Capacity : 100,000 LTRS.
Total Distillation Capacity 35,000 LTR/Day
Connected Power : 600KVA
Cooling Water Tower : 2000TR
Chilled Water & Chilled Brine Capacity : 500TR
Storage capacity : 500,000 LTR
Crystalization Chamber capacity : 100 tonnes/month
Deep freezer capacity : 400 tonnes/month
Pyrolysis units : 2
Auto Clave Capacity : 20000 LTRS.
Crystal drying chamber with conveyer belts : 2